:: Menu

General
Organization
Introduction
History
1927 Flood
Current Projects
Maintenance Activities
River stages/Forecasts
Questions/Comments
Links
Newsletters
Home

Projects
Levee Enlargement
Yazoo Backwater
Big Sunflower River

Print Ads
Yazoo Backwater
Big Sunflower River
Levee Board 1
Levee Board 2
Levee Board 3
Levee Board 4
Levee Board 5
Levee Board 6
Levee Engagement
Big Sunflower Project
YBW Project
YBW Project 2
Levee Damage
Mitigation
Winterville Mounds

Brochures
General Information
The Truth About DDT
Levee Enlargement
Yazoo Backwater
Big Sunflower River

 

 

R.O.W. Clearing

If not properly maintained, vegetation begins to grow through fences and unto the levee structure. Periodically, the Mississippi Levee Board will utilize its' equipment to clear vegetation (trees and bushes) away from the toe of the levee structure. The vegetation is piled and burned.

 

 

 

 

Organization | Introduction | History | 1927 Flood | Current Projects | Maintenance Activities | River Stages/Forecasts
Questions/Comments | The Truth About DDT | Levee Enlargement | Yazoo Backwater |
Big Sunflower River | Links | Home